Lead Services
Lead Paint Inspection & Testing in Denver and Across Colorado
XRF and paint chip testing for renovation, real estate, rental and remediation projects. Certified inspectors, clear results and a straightforward report.
What We Do
Lead-Paint Inspections (XRF)
We test painted surfaces on site with XRF analyzers, so results are known in real time. No samples are needed, there are no lab fees, and the surface is not damaged. Because XRF is faster and more economical, more surfaces can be tested, which makes for a more thorough inspection. You get a report showing which surfaces contain lead and where.
Paint Chip Sampling
Paint chip sampling is available when a project calls for it, such as when a laboratory result is required, though it is rarely needed when XRF testing is available. Samples are sent to a certified laboratory for analysis.
Pre-Renovation Testing
Find out which surfaces contain lead before the work starts, so you can plan the project and protect workers and occupants.
Real Estate and Rental Testing
Testing for buyers, sellers, landlords and property managers of older buildings, with documentation you can keep on file.
Lead Clearances (Dust-Lead Action Levels)
After lead-based paint remediation, we take dust-wipe samples and verify that the work area is clean and ready to reopen. Samples are sent to a certified laboratory, and rush turnaround is available.
Clear Written Reports
A readable report that identifies where lead was found and what was tested, so the next step is obvious.
- Serving Colorado since 2005
- CDPHE-certified lead-based paint inspectors and risk assessors
- EPA-certified Lead-Safe Firm (RRP)
- Real-time XRF readings, no damage to surfaces, no lab fees
Common Reasons Clients Call Us
- Planning a renovation or repaint in a home or building built before 1978
- Buying, selling or renting an older property
- Peeling, chipping or deteriorating paint
- A child-care facility, school or rental needs documentation
- A contractor needs to confirm lead before work begins
- Remediation is finished and needs a clearance
Who We Work With
How It Works
Call or Send a Request
Tell us about the property and the project. We confirm scope and what you need.
We Schedule It Fast
Most Metro and Front Range addresses are scheduled within a day or two, and same day when it is urgent.
Testing on Site
A certified inspector tests surfaces with XRF and collects paint chip samples where needed.
Report and Next Steps
You get a clear, readable report and guidance on what the results mean for your project.
Turnaround
Getting on Site
Usually within a day or two for the Metro and Front Range, same day for urgent situations.
XRF Results
XRF readings are known in real time while the inspector is on site, with no lab wait and no lab fees.
Lab Analysis
Turnaround depends on the analysis and the laboratory option you choose. We confirm timing when we scope your job.
Common Questions
Do I need lead testing before a renovation?
Federal rules require lead-safe work practices for most renovation, repair and painting in homes and child-care facilities built before 1978. Testing tells you which surfaces actually contain lead, so you know where those requirements apply.
What is the difference between XRF and paint chip testing?
XRF reads the lead content of paint on site without removing it, so results are known in real time, the surface is not damaged, and there are no lab fees. Because it is faster and more economical, more surfaces can be tested. Paint chip sampling removes a small sample for laboratory analysis and is available when a lab result is required, though it is rarely needed when XRF testing is available.
What are the current dust-lead action levels?
The U.S. Environmental Protection Agency (EPA) defines Dust-Lead Action Levels (DLALs), formerly known as dust-lead clearance levels. Under EPA's 2024 rule they are 5 micrograms per square foot (µg/ft²) on floors, 40 on window sills and 100 in window troughs, down from 10, 100 and 400. After abatement, dust-wipe results at or above an action level mean the area needs to be re-cleaned and retested before it is cleared. We test against the current levels.
What changed from the old hazard standards and clearance levels?
EPA's 2024 rule renamed and separated the two thresholds. Dust-lead clearance levels are now Dust-Lead Action Levels, and dust-lead hazard standards are now dust-lead reportable levels, which means any reportable level measured by an EPA-recognized (NLLAP) laboratory. The old hazard standards were 10 µg/ft² on floors and 100 on window sills. These changes come from EPA, not from Colorado's Regulation 19, and they make the standard stricter. Colorado's lead rules still apply too, so we confirm which levels govern your project before testing.
Do I have to disclose lead paint when selling or renting?
For housing built before 1978, sellers and landlords generally must disclose known lead-based paint and provide the EPA lead hazard information pamphlet. Testing gives you documented results to disclose.
How fast can you get on site?
For most Metro and Front Range addresses we can usually schedule within a day or two, and same day for urgent circumstances. For projects further away we can still usually schedule faster than most firms, and we will tell you honestly what we can do.
Where do you work?
We are based in Lakewood and serve the Denver metro area, the mountains and the Western Slope across Colorado, plus select neighboring states.
Regulations and Helpful Links
- Colorado Regulation Number 19: The Control of Lead Hazards (5 CCR 1001-23). Updated levels: EPA's 2024 rule made the dust-lead levels stricter, so older dust-lead figures here are superseded.PDF
- EPA: Hazard Standards and Clearance Levels for Lead in Paint, Dust and Soil (Dust-Lead Action Levels)LINK
- EPA Renovation, Repair and Painting (RRP) Rule, 40 CFR Part 745 Subpart E: Small Entity Compliance GuidePDF
- CDPHE: lead-based paint and renovationLINK
- Our asbestos inspection and testing servicesPAGE
Related Services
Ready to Schedule Lead Testing?
Call or send a request and we will confirm scope and timing.